Integrating Heating and Cooling in Your Next Outdoor Design Project
The best time to plan for misting or outdoor heating is during the design phase. Waiting until after the structure is built gives the contractor limited installation options and you’re left with misting lines and outdoor heaters that are visible and don’t flow with the rest of the design.